Altana LC 4 User Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 61
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
Commissioning BYK LC 4
10
3.3 Connecting the sensor module
1 Unscrew the coupling ring (1) from the meter.
2 Place the sensor module (2) in a straight position to the meter (turn
the wide cut-out to the front) and plug it in carefully with slight force.
3 Using the coupling ring (1), screw the sensor module tight.
The instrument is ready for operation.
1
2
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 60 61

Comments to this Manuals

No comments